Acciona Cultural Engineering (ACE), along with local partner UCC, has said that their joint venture is responsible for delivering the Museography works,...
Upgrades to the infrastructure and facilities aim to improve operational efficiency and enhance fan,...
The project will offer 200 units, ranging from studios to 2-bedroom apartments, spread across...
Each project has a planned generation capacity of 1,800MW, significantly contributing to the Kingdom’s...
The mixed-use project spans approximately 241,000sqm and includes a 200-key Waldorf Astoria Hotel, 47...
The development includes a 275m water canal, a 360m jogging track, sports facilities and...