RTA to open final bridge of WTC Roundabout on October 30
The new bridge will reduce journey times on this route from 6 minutes to 1 minute easing congestion at one of Dubai’s key road intersections
Dubai’s Roads and Transport Authority (RTA) will open the final bridge of the World Trade Centre Roundabout Development Project on October 30, completing a major road infrastructure scheme designed to improve traffic flow along Sheikh Zayed Road and strengthen connectivity across the emirate.
The 1km long, 2-lane bridge will accommodate up to 3,000 vehicles per hour, providing a direct connection for traffic travelling from Al Majlis Street towards 2nd December Street.
According to the RTA, the new bridge will reduce journey times on this route from 6 minutes to 1 minute, easing congestion at one of Dubai’s key road intersections.
The opening marks the completion of all major works under the US $189.4mn project, which involved the construction of 5 bridges with a combined length of 5,000m.
Mattar Al Tayer, director general and chairman of the board of executive directors at the RTA, said the project supports Dubai’s ongoing investment in road infrastructure, with a focus on improving traffic movement along Sheikh Zayed Road and connections between major economic and commercial centres.
He added that the scheme is intended to increase road network capacity in line with the emirate’s population, urban and economic growth, while supporting business, investment and tourism.

The World Trade Centre Roundabout is a major intersection linking Sheikh Zayed Road with 5 key streets: Sheikh Khalifa bin Zayed Street, Sheikh Rashid Street, 2nd December Street, Za’abeel Palace Street and Al Majlis Street.
The development involved converting the former roundabout into an intersection and building 5 bridges to provide free-flowing traffic movements in multiple directions.
The completed infrastructure is expected to strengthen connections between Sheikh Zayed Road and surrounding roads, improve access to commercial and residential districts, and increase the intersection’s traffic capacity.
Al Tayer said the project’s location makes it strategically important, given its proximity to Dubai World Trade Centre, which hosts major international exhibitions and conferences, and the Dubai International Financial Centre (DIFC), a major financial hub. The surrounding areas also generate significant traffic throughout the day.
According to the RTA, the improvements will reduce average delays at the intersection from 12 minutes to 90 seconds, benefiting more than 500,000 residents and tourists.